Job completed for Water Loss in Elementary School in White Plains, NY

Completion date: January 9, 2023

Location: White Plains, NY

Why did the customer contact us?

Multiple frozen pipes caused water damage throughout this elementary school. The movie theater, hallways, classrooms and storage rooms were all affected by the flood of water.

Solutions provided:

Rob the Project Manager walked throughout the whole school with the head janitor to document the water damaged areas. Rob suggested mold testing based on some visible mold growth he saw. The crew was called in to remove molding to dry the inside of the walls with fans and heaters. Multiple pieces of equipment were placed throughout the school to dry the water and to remove the moisture as quickly as possible.

Photos & Videos:

Water damage in ceiling
Large View Icon
Water damage in ceiling
Flood cuts
Large View Icon
Flood cuts
Drying equipment
Large View Icon
Drying equipment
Mold growth
Large View Icon
Mold growth
Containment
Large View Icon
Containment
Auditorium
Large View Icon
Auditorium